Oncor's delivery charges are the part of a Dallas-Fort Worth business electricity bill that no retail provider can change: Oncor delivers the power, the Public Utility Commission of Texas approves the prices, and your provider passes them through. Above 10 kW most of them are billed on your peak demand, and one high peak can keep you billed at 80% of that figure for the next 11 months. Here is what each line pays for, why 2026 bills look different, and what you can change.
By Wire & Watt Published Updated
What are Oncor delivery charges?
Oncor owns the poles, wires and meters that deliver electricity in its service area. It does not sell electricity. Your retail electricity provider buys the power, sells it to you and sends the bill.
Oncor charges your provider for delivering and metering that power, and your provider passes those delivery charges on to you. The rates come from Oncor’s Tariff for Retail Delivery Service, which is approved by the Public Utility Commission of Texas. They apply whichever provider you choose. Your provider may show them as one line or several.
Which rate class is my business on?
Most businesses fall into one of two Oncor rate classes for secondary service, which is the standard voltage most buildings take.
- Secondary Service Less Than or Equal to 10 kW. Small sites. Apart from two fixed monthly charges, the delivery charges are priced on the kWh you use.
- Secondary Service Greater Than 10 kW. Sites with commercial kitchens, refrigeration or larger air conditioning often fall here. Most delivery charges are priced on your peak demand in kW.
A site moves up to the larger class the month after it records demand above 12 kW, or after it records demand above 10 kW three times in a rolling 12 months. It moves back only after 12 consecutive billing months with no demand above 10 kW.
What each Oncor charge pays for.
For a site on Secondary Service Greater Than 10 kW, Oncor’s delivery charges are made up of the following. The prices change between rate cases: new base rates took effect June 1, 2026, the TCRF and DCRF riders were revised on October 4, 2026, and Rider IS runs through December 2026. The current amounts, each with its sheet date, are in the next section.
| Charge | Billed on | What it pays for |
|---|---|---|
| Customer charge | Fixed, per month | Customer service and billing for your account. |
| Metering charge | Fixed, per month | The meter and reading it. |
| Distribution System Charge | Per billing kW | The local poles, wires and substations that deliver power to your site. |
| Transmission Cost Recovery Factor (TCRF) | Per NCP kW, or 4CP kW for large sites | Your share of the cost of the ERCOT high-voltage transmission system. |
| Distribution Cost Recovery Factor (DCRF) | Per billing kW | Distribution investment Oncor recovers between full rate cases. |
| Energy Efficiency Cost Recovery Factor (EECRF) | Per kWh | Oncor's energy efficiency incentive programs. |
| Nuclear Decommissioning Charge | Per billing kW | Safely retiring nuclear generating plants. |
| Rate case expense and mobile generation | Per billing kW | Regulatory proceedings, and temporary generation Oncor leases for major outages. |
| Interim Surcharge (Rider IS) | Per distribution billing kW | A temporary charge from August 1 through December 2026 that recovers the difference between the rates approved in Oncor's 2026 rate case (PUCT Docket 58306) and the rates in effect on January 1, 2026. |
On the smaller class, the same charges are priced per kWh instead of per kW, apart from the fixed customer and metering charges.
What Oncor charges right now.
From the tariff sheets in force on October 31, 2026. Sites at or below 10 kW pay per kWh; sites above 10 kW pay mostly per kW of demand, with the distribution price depending on load factor (the band table is in the ratchet section above). The Texas prices page holds the same tables beside CenterPoint’s and the state averages.
| Charge | Amount | Sheet effective |
|---|---|---|
| Customer charge | $2.34 per month | June 1, 2026 |
| Metering charge | $4.36 per month | June 1, 2026 |
| Distribution System Charge | $0.031236 per kWh | June 1, 2026 |
| Transmission Cost Recovery Factor (TCRF) | $0.013382 per kWh | October 4, 2026 |
| Distribution Cost Recovery Factor (DCRF) | $0.006208 per kWh | October 4, 2026 |
| Interim Surcharge (Rider IS)Through December 2026 | $0.002878 per kWh | August 1, 2026 |
| Mobile Generation (Rider MG) | $0.000606 per kWh | December 1, 2025 |
| Rate Case Expense Surcharge (Rider RCE) | $0.000084 per kWh | June 1, 2026 |
| Energy Efficiency Cost Recovery Factor (EECRF) | $0.000055 per kWh | March 1, 2026 |
| Nuclear Decommissioning Charge (Rider NDC) | $0.000000 per kWh | December 15, 2025 |
| Added up | $6.70 per month, fixed$0.054449 per kWh (5.44 cents) | |
| Charge | Amount | Sheet effective |
|---|---|---|
| Customer charge | $24.00 per month | June 1, 2026 |
| Metering charge | $20.99 per month | June 1, 2026 |
| Distribution System ChargeLowest band; $8.318122 to $9.831092 for sites over 20 kW with a load factor of 25% or less (table below) | $6.931363 per billing kW | June 1, 2026 |
| Transmission Cost Recovery Factor (TCRF)$6.536625 per 4CP kW for sites that have reached 700 kW | $4.606104 per NCP kW | October 4, 2026 |
| Distribution Cost Recovery Factor (DCRF) | $1.068522 per billing kW | October 4, 2026 |
| Interim Surcharge (Rider IS)Through December 2026 | $0.997891 per billing kW | August 1, 2026 |
| Mobile Generation (Rider MG) | $0.156662 per billing kW | December 1, 2025 |
| Rate Case Expense Surcharge (Rider RCE) | $0.016827 per billing kW | June 1, 2026 |
| Energy Efficiency Cost Recovery Factor (EECRF) | $0.000546 per kWh | March 1, 2026 |
| Nuclear Decommissioning Charge (Rider NDC) | $0.000000 per billing kW | December 15, 2025 |
| Added up | $44.99 per month, fixed$9.171265 per billing kW$4.606104 per NCP kW (the month’s 15-minute peak)$0.000546 per kWh (0.05 cents) | |
Worked month, as an illustration only: a site with a 50 kW peak that is also its billing kW, 15,000 kWh, lowest distribution band, pays about $742 in Oncor charges, or 4.9 cents per kWh before supply, taxes and fees.
How Oncor measures your peak.
Oncor measures demand in 15-minute intervals. Your NCP kW for the month is the kW supplied during the 15-minute period of highest use in that billing month. Oncor compares it to a car’s speedometer: the meter keeps the highest mark of the month and resets at the end of each billing cycle.
Our guide to demand charges explains the difference between demand (kW) and usage (kWh) in more detail.
The 80% ratchet.
For larger sites, the distribution charge is not always based on this month’s peak. If your site’s highest peak in the previous 11 months was above 20 kW and its annual load factor is above 25%, the billing kW for the Distribution System Charge is the higher of:
- this month’s NCP kW, or
- 80% of the highest monthly NCP kW in the previous 11 months.
So one very high peak in the summer can keep your distribution charge up for the rest of the year. Sites whose previous 11-month peak was 20 kW or less, and sites with an annual load factor of 25% or less, are billed on the current month’s peak instead. This follows the Texas rule that a demand ratchet may not apply to nonresidential secondary customers with a load factor of 25% or less.
Several riders, including the Nuclear Decommissioning Charge and the Distribution Cost Recovery Factor, use the 80% ratchet for every site on this rate class.
Load factor and the price per kW.
Load factor compares your average use with your peak. A business that runs steadily all day has a high load factor; one with short, sharp peaks has a low one. Oncor calculates it for each site from the 12 billing months ending in December, and uses it for the next 12 billing months:
kWh used in the 12 months ÷ (highest NCP kW in those months × days in the billing periods × 24)
Above 20 kW, the Distribution System Charge per kW depends on that load factor:
| Site | Distribution price per kW |
|---|---|
| Up to 20 kW peak | One price per kW, whatever the load factor. |
| Over 20 kW, load factor 0% to 10% | Highest price per kW. |
| Over 20 kW, load factor 11% to 25% | Price per kW steps down in three bands. |
| Over 20 kW, load factor 26% and above | Lowest price per kW, the same as the up-to-20 kW price. |
A low load factor means a higher price per kW but no 80% ratchet; a high load factor means the lowest price per kW but the ratchet applies. Sites with less than 90 days of history are treated as having a load factor above 25%.
4CP for large sites.
A site that has reached 700 kW or more in any previous billing month is billed the Transmission Cost Recovery Factor on its 4CP kW instead of its monthly peak. 4CP kW is the average of the site’s demand at the moment of ERCOT’s system peak in each of June, July, August and September of the previous year. Oncor updates it every January 1 and keeps it fixed for the year.
That is why large sites try to cut use on the hottest summer afternoons. Sites below 700 kW are billed the Transmission Cost Recovery Factor on their own monthly peak.
What you can and cannot change.
A new supply contract does not change Oncor’s delivery charges; they apply whichever provider you choose. What you can influence is the demand those charges are priced on:
- Check the rate class on your bill, and whether a site sits just above 10 kW.
- Stagger equipment start-up so ovens, compressors and air conditioning do not all start in the same 15 minutes.
- Watch the demand line each month and tie a high reading to what happened that day, especially in summer, when one peak can carry into the next 11 months.
When we review a bill, we compare the supply charges and flag the delivery charges so you see the whole picture. For a site in Houston, see our guide to CenterPoint delivery charges. For a Dallas-Fort Worth site, start with your ZIP and add your bill when you have it.
Common questions
- What are Oncor delivery charges?
- The charges Oncor bills your retail electricity provider for delivering and metering power in its area, under a tariff approved by the Public Utility Commission of Texas. They appear on your bill whichever provider you choose, and no provider can discount them.
- Why are Oncor delivery charges higher in 2026?
- Three dated changes in Oncor's tariff: new base rates from its 2026 rate case took effect June 1; from August 1 through December 2026 a Rider IS interim surcharge recovers the difference between those rates and the rates in effect on January 1, 2026, billed per distribution billing kW on sites above 10 kW; and the TCRF and DCRF riders were revised on October 4. Compare the TDU section of a spring bill and an autumn bill line by line to see which moved for your meter.
- Can a business avoid or reduce Oncor delivery charges?
- You cannot switch away from them or get them discounted. You can lower the kW they are billed on: keep your highest 15 minutes of the month down (stagger start-up, pre-cool before opening), avoid a single spike that sets an 80% ratchet floor for the next 11 months, and note that sites with an annual load factor of 25% or less are billed on the current month's peak only. Our ratchet calculator shows which kW your distribution charge is priced on.
- How much are Oncor delivery charges for a business?
- For a site above 10 kW on the lowest distribution band: $44.99 a month fixed, $9.171265 per billing kW, $4.606104 per NCP kW and $0.000546 per kWh, from sheets effective June 1 to October 4, 2026; a 50 kW, 15,000 kWh month is about $742. Sites at or below 10 kW pay 5.44 cents per kWh plus $6.70 a month. Each line is in the table above with its sheet date.
- What is Oncor's 80% ratchet?
- For a site whose highest peak in the past 11 months was above 20 kW and whose annual load factor is above 25%, Oncor bills the Distribution System Charge on the higher of this month's peak and 80% of that highest peak. Several riders use the 80% ratchet for every site on the larger rate class.
- When does a business move to Oncor's larger rate class?
- The month after it records demand above 12 kW, or after it records demand above 10 kW three times in a rolling 12 months. It moves back only after 12 consecutive billing months with no demand above 10 kW.
- Does Oncor bill 4CP?
- Yes, for sites that have reached 700 kW or more. Their Transmission Cost Recovery Factor is billed on demand at ERCOT's system peaks in June, July, August and September of the previous year, updated every January 1.
Sources and scope
Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.
Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.
- Oncor: Delivery Charges 101 (residential and secondary services) (opens in a new tab)
- Oncor Tariff for Retail Delivery Service, 6.1.1.1.2 and 6.1.1.1.3 (revision 12, effective June 1, 2026) (opens in a new tab)
- Oncor Tariff for Retail Delivery Service, riders TCRF and DCRF (revised Oct. 4, 2026) and Rider IS, Interim Surcharge (effective Aug. 1, 2026, through December 2026) (opens in a new tab)
- Oncor: Economic development and service area (opens in a new tab)