Oncor's delivery charges are the part of a Dallas-Fort Worth business electricity bill that no retail provider can change: Oncor delivers the power, the Public Utility Commission of Texas approves the prices, and your provider passes them through. Above 10 kW most of them are billed on your peak demand, and one high peak can keep you billed at 80% of that figure for the next 11 months. Here is what each line pays for, why 2026 bills look different, and what you can change.

By Wire & Watt Published Updated

What are Oncor delivery charges?

Oncor owns the poles, wires and meters that deliver electricity in its service area. It does not sell electricity. Your retail electricity provider buys the power, sells it to you and sends the bill.

Oncor charges your provider for delivering and metering that power, and your provider passes those delivery charges on to you. The rates come from Oncor’s Tariff for Retail Delivery Service, which is approved by the Public Utility Commission of Texas. They apply whichever provider you choose. Your provider may show them as one line or several.

Which rate class is my business on?

Most businesses fall into one of two Oncor rate classes for secondary service, which is the standard voltage most buildings take.

  • Secondary Service Less Than or Equal to 10 kW. Small sites. Apart from two fixed monthly charges, the delivery charges are priced on the kWh you use.
  • Secondary Service Greater Than 10 kW. Sites with commercial kitchens, refrigeration or larger air conditioning often fall here. Most delivery charges are priced on your peak demand in kW.

A site moves up to the larger class the month after it records demand above 12 kW, or after it records demand above 10 kW three times in a rolling 12 months. It moves back only after 12 consecutive billing months with no demand above 10 kW.

What each Oncor charge pays for.

For a site on Secondary Service Greater Than 10 kW, Oncor’s delivery charges are made up of the following. The prices change between rate cases: new base rates took effect June 1, 2026, the TCRF and DCRF riders were revised on October 4, 2026, and Rider IS runs through December 2026. The current amounts, each with its sheet date, are in the next section.

Oncor delivery charges for Secondary Service Greater Than 10 kW
ChargeBilled onWhat it pays for
Customer chargeFixed, per monthCustomer service and billing for your account.
Metering chargeFixed, per monthThe meter and reading it.
Distribution System ChargePer billing kWThe local poles, wires and substations that deliver power to your site.
Transmission Cost Recovery Factor (TCRF)Per NCP kW, or 4CP kW for large sitesYour share of the cost of the ERCOT high-voltage transmission system.
Distribution Cost Recovery Factor (DCRF)Per billing kWDistribution investment Oncor recovers between full rate cases.
Energy Efficiency Cost Recovery Factor (EECRF)Per kWhOncor's energy efficiency incentive programs.
Nuclear Decommissioning ChargePer billing kWSafely retiring nuclear generating plants.
Rate case expense and mobile generationPer billing kWRegulatory proceedings, and temporary generation Oncor leases for major outages.
Interim Surcharge (Rider IS)Per distribution billing kWA temporary charge from August 1 through December 2026 that recovers the difference between the rates approved in Oncor's 2026 rate case (PUCT Docket 58306) and the rates in effect on January 1, 2026.

On the smaller class, the same charges are priced per kWh instead of per kW, apart from the fixed customer and metering charges.

What Oncor charges right now.

From the tariff sheets in force on October 31, 2026. Sites at or below 10 kW pay per kWh; sites above 10 kW pay mostly per kW of demand, with the distribution price depending on load factor (the band table is in the ratchet section above). The Texas prices page holds the same tables beside CenterPoint’s and the state averages.

Oncor, Secondary Service Less Than or Equal to 10 kW. Oncor tariff sheet 6.1.1.1.2, revision 12; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$2.34 per monthJune 1, 2026
Metering charge$4.36 per monthJune 1, 2026
Distribution System Charge$0.031236 per kWhJune 1, 2026
Transmission Cost Recovery Factor (TCRF)$0.013382 per kWhOctober 4, 2026
Distribution Cost Recovery Factor (DCRF)$0.006208 per kWhOctober 4, 2026
Interim Surcharge (Rider IS)Through December 2026$0.002878 per kWhAugust 1, 2026
Mobile Generation (Rider MG)$0.000606 per kWhDecember 1, 2025
Rate Case Expense Surcharge (Rider RCE)$0.000084 per kWhJune 1, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.000055 per kWhMarch 1, 2026
Nuclear Decommissioning Charge (Rider NDC)$0.000000 per kWhDecember 15, 2025
Added up$6.70 per month, fixed$0.054449 per kWh (5.44 cents)
Oncor, Secondary Service Greater Than 10 kW. Oncor tariff sheet 6.1.1.1.3, revision 12; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$24.00 per monthJune 1, 2026
Metering charge$20.99 per monthJune 1, 2026
Distribution System ChargeLowest band; $8.318122 to $9.831092 for sites over 20 kW with a load factor of 25% or less (table below)$6.931363 per billing kWJune 1, 2026
Transmission Cost Recovery Factor (TCRF)$6.536625 per 4CP kW for sites that have reached 700 kW$4.606104 per NCP kWOctober 4, 2026
Distribution Cost Recovery Factor (DCRF)$1.068522 per billing kWOctober 4, 2026
Interim Surcharge (Rider IS)Through December 2026$0.997891 per billing kWAugust 1, 2026
Mobile Generation (Rider MG)$0.156662 per billing kWDecember 1, 2025
Rate Case Expense Surcharge (Rider RCE)$0.016827 per billing kWJune 1, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.000546 per kWhMarch 1, 2026
Nuclear Decommissioning Charge (Rider NDC)$0.000000 per billing kWDecember 15, 2025
Added up$44.99 per month, fixed$9.171265 per billing kW$4.606104 per NCP kW (the month’s 15-minute peak)$0.000546 per kWh (0.05 cents)

Worked month, as an illustration only: a site with a 50 kW peak that is also its billing kW, 15,000 kWh, lowest distribution band, pays about $742 in Oncor charges, or 4.9 cents per kWh before supply, taxes and fees.

How Oncor measures your peak.

Oncor measures demand in 15-minute intervals. Your NCP kW for the month is the kW supplied during the 15-minute period of highest use in that billing month. Oncor compares it to a car’s speedometer: the meter keeps the highest mark of the month and resets at the end of each billing cycle.

Our guide to demand charges explains the difference between demand (kW) and usage (kWh) in more detail.

The 80% ratchet.

For larger sites, the distribution charge is not always based on this month’s peak. If your site’s highest peak in the previous 11 months was above 20 kW and its annual load factor is above 25%, the billing kW for the Distribution System Charge is the higher of:

  • this month’s NCP kW, or
  • 80% of the highest monthly NCP kW in the previous 11 months.

So one very high peak in the summer can keep your distribution charge up for the rest of the year. Sites whose previous 11-month peak was 20 kW or less, and sites with an annual load factor of 25% or less, are billed on the current month’s peak instead. This follows the Texas rule that a demand ratchet may not apply to nonresidential secondary customers with a load factor of 25% or less.

Several riders, including the Nuclear Decommissioning Charge and the Distribution Cost Recovery Factor, use the 80% ratchet for every site on this rate class.

Load factor and the price per kW.

Load factor compares your average use with your peak. A business that runs steadily all day has a high load factor; one with short, sharp peaks has a low one. Oncor calculates it for each site from the 12 billing months ending in December, and uses it for the next 12 billing months:

kWh used in the 12 months ÷ (highest NCP kW in those months × days in the billing periods × 24)

Above 20 kW, the Distribution System Charge per kW depends on that load factor:

How annual load factor sets Oncor’s distribution price per kW
SiteDistribution price per kW
Up to 20 kW peakOne price per kW, whatever the load factor.
Over 20 kW, load factor 0% to 10%Highest price per kW.
Over 20 kW, load factor 11% to 25%Price per kW steps down in three bands.
Over 20 kW, load factor 26% and aboveLowest price per kW, the same as the up-to-20 kW price.

A low load factor means a higher price per kW but no 80% ratchet; a high load factor means the lowest price per kW but the ratchet applies. Sites with less than 90 days of history are treated as having a load factor above 25%.

4CP for large sites.

A site that has reached 700 kW or more in any previous billing month is billed the Transmission Cost Recovery Factor on its 4CP kW instead of its monthly peak. 4CP kW is the average of the site’s demand at the moment of ERCOT’s system peak in each of June, July, August and September of the previous year. Oncor updates it every January 1 and keeps it fixed for the year.

That is why large sites try to cut use on the hottest summer afternoons. Sites below 700 kW are billed the Transmission Cost Recovery Factor on their own monthly peak.

What you can and cannot change.

A new supply contract does not change Oncor’s delivery charges; they apply whichever provider you choose. What you can influence is the demand those charges are priced on:

  • Check the rate class on your bill, and whether a site sits just above 10 kW.
  • Stagger equipment start-up so ovens, compressors and air conditioning do not all start in the same 15 minutes.
  • Watch the demand line each month and tie a high reading to what happened that day, especially in summer, when one peak can carry into the next 11 months.

When we review a bill, we compare the supply charges and flag the delivery charges so you see the whole picture. For a site in Houston, see our guide to CenterPoint delivery charges. For a Dallas-Fort Worth site, start with your ZIP and add your bill when you have it.

Common questions

What are Oncor delivery charges?
The charges Oncor bills your retail electricity provider for delivering and metering power in its area, under a tariff approved by the Public Utility Commission of Texas. They appear on your bill whichever provider you choose, and no provider can discount them.
Why are Oncor delivery charges higher in 2026?
Three dated changes in Oncor's tariff: new base rates from its 2026 rate case took effect June 1; from August 1 through December 2026 a Rider IS interim surcharge recovers the difference between those rates and the rates in effect on January 1, 2026, billed per distribution billing kW on sites above 10 kW; and the TCRF and DCRF riders were revised on October 4. Compare the TDU section of a spring bill and an autumn bill line by line to see which moved for your meter.
Can a business avoid or reduce Oncor delivery charges?
You cannot switch away from them or get them discounted. You can lower the kW they are billed on: keep your highest 15 minutes of the month down (stagger start-up, pre-cool before opening), avoid a single spike that sets an 80% ratchet floor for the next 11 months, and note that sites with an annual load factor of 25% or less are billed on the current month's peak only. Our ratchet calculator shows which kW your distribution charge is priced on.
How much are Oncor delivery charges for a business?
For a site above 10 kW on the lowest distribution band: $44.99 a month fixed, $9.171265 per billing kW, $4.606104 per NCP kW and $0.000546 per kWh, from sheets effective June 1 to October 4, 2026; a 50 kW, 15,000 kWh month is about $742. Sites at or below 10 kW pay 5.44 cents per kWh plus $6.70 a month. Each line is in the table above with its sheet date.
What is Oncor's 80% ratchet?
For a site whose highest peak in the past 11 months was above 20 kW and whose annual load factor is above 25%, Oncor bills the Distribution System Charge on the higher of this month's peak and 80% of that highest peak. Several riders use the 80% ratchet for every site on the larger rate class.
When does a business move to Oncor's larger rate class?
The month after it records demand above 12 kW, or after it records demand above 10 kW three times in a rolling 12 months. It moves back only after 12 consecutive billing months with no demand above 10 kW.
Does Oncor bill 4CP?
Yes, for sites that have reached 700 kW or more. Their Transmission Cost Recovery Factor is billed on demand at ERCOT's system peaks in June, July, August and September of the previous year, updated every January 1.

Sources and scope

Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.

Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.

Put it into practice

Have a contract to review?

Start with your business ZIP, business name and email. Add every page of your bill when you have it. With Box Energy, we compare available offers. No fee for our help.

Start my rate comparison

Before you choose

Make sense of your next contract.

Contract timing

Business electricity contract renewal: what happens when it ends

What happens when a business electricity contract ends in Texas, the 14-day notice and no-penalty rules for small commercial accounts, how early you can lock the next term, and what to have ready.

Read the guide
Quote comparison

How to compare commercial electricity quotes

How to line up business electricity quotes on the same basis: same meter, usage, start date and term, what each rate includes, what a fixed rate fixes, and what to check before you sign.

Read the guide
Bill basics

How to read a commercial electricity bill (Texas)

Usage, supply, delivery, demand and taxes: what each line on a business electric bill means, which one a new contract can change, and what to have ready before a review.

Read the guide
Demand charges

Demand charges: what they are and how to lower them (Texas)

Why a business pays for its highest 15 minutes of the month, how demand differs from usage, what a ratchet and 4CP do, and how to bring the peak down. Texas rules, sourced.

Read the guide
Calculator

Oncor demand ratchet calculator

Work out the demand Oncor bills a Texas business this month: the 80% ratchet, its 20 kW and 25% load factor exemptions, and your load factor band.

Read the guide
Delivery charges

CenterPoint delivery charges for businesses (2026)

What each CenterPoint delivery charge on a Houston business bill pays for, why it is billed in kVA, which riders changed in 2026, IDR metering and 4CP, and how it differs from Oncor.

Read the guide
Prices and charges

Texas commercial electricity prices: averages and delivery charges (2026)

The average price Texas businesses pay (EIA, monthly) and the current Oncor and CenterPoint delivery charges for business sites, every figure dated to its tariff sheet, with a worked month.

Read the guide
Rate types

Fixed, variable or indexed: business electricity rates in Texas

What each rate type lets your supplier change, why a business under 50 kW can only buy fixed or variable, what a fixed rate still passes through, and what to ask when a larger site is offered an indexed or pass-through plan.

Read the guide
Load factor

Commercial electricity load factor: how to calculate it

Load factor compares a business's average demand with its peak. How to calculate it from three numbers on your bill, what 50% means, where it changes what you pay at Oncor, and how suppliers and ERCOT use it. With a calculator.

Read the guide
Bill basics

ESI ID: what it is and how a Texas business finds it

The ESI ID is the number that identifies each electricity service point in Texas. What it looks like (17 or 22 digits, by utility), where it is on the bill, how to look it up without one, and why a business with several sites has several.

Read the guide
Restaurant electricity

Put your restaurant’s rate beside the options.

Start with your business ZIP. Add your bill now or later. We compare available supply offers with Box Energy.

Start my comparison
Start my rate comparison