Skip to content
Wire&Watt

Energy field notes / Delivery charges

CenterPoint delivery charges for businesses (2026)

CenterPoint's delivery charges are the part of a Houston business electricity bill that no retail provider can change: CenterPoint Energy Houston Electric delivers the power, the Public Utility Commission of Texas approves the prices, and your provider passes them through. Above 10 kVA most of them are billed on your peak demand for the month, measured in kVA rather than kW, with no ratchet on the distribution charge. Here is what each line pays for, which lines changed in 2026, and what you can do about the total.

By Wire & Watt Published Updated

What are CenterPoint delivery charges?

CenterPoint Energy Houston Electric operates the transmission and distribution system in the Houston area and does not generate electricity. Your retail electricity provider sells you the supply and sends the bill.

CenterPoint charges your provider for delivering and metering the power, and your provider passes those delivery charges on to you. The rates come from CenterPoint’s Tariff for Retail Delivery Service, approved by the Public Utility Commission of Texas, and they apply whichever provider you choose.

Which rate class is my business on?

  • Secondary Service Less Than or Equal to 10 kVA. Small sites. Apart from fixed monthly charges, the delivery charges are priced on the kWh you use.
  • Secondary Service Greater Than 10 kVA. Non-residential sites whose peak demand is above 10 kVA in the current month, or was above 10 kVA in any of the previous 11 months. Most delivery charges are priced on peak demand.

Sites with commercial kitchens, refrigeration or larger air conditioning often fall into the larger class.

Why CenterPoint bills in kVA.

CenterPoint measures demand in kilovolt-amperes (kVA), where Oncor uses kilowatts (kW). kVA counts all the power your equipment draws from the lines, including the part that does no useful work, so a site’s kVA is usually a little higher than its kW. Equipment such as motors and compressors widens the gap.

What each CenterPoint charge pays for.

For a site on Secondary Service Greater Than 10 kVA, CenterPoint’s delivery charges are made up of the following. The prices change between rate cases: in 2026 the TCRF and Schedule SRC II changed on September 1, the TEEEF rider (temporary emergency generation) on August 15 and the DCRF rider on September 30. The current amounts, each with its sheet date, are in the next section.

CenterPoint delivery charges for Secondary Service Greater Than 10 kVA
ChargeBilled onWhat it pays for
Customer chargeFixed, per monthCustomer service and billing. Higher for IDR-metered accounts.
Metering chargeFixed, per meter, per monthThe meter and reading it. Higher for IDR-metered accounts.
Distribution System ChargePer billing kVAThe local poles, wires and substations that deliver power to your site.
Transmission Cost Recovery Factor (TCRF)Per NCP kVA, or 4CP kVA if IDR-meteredYour share of the cost of the ERCOT high-voltage transmission system.
Distribution Cost Recovery Factor (DCRF)Per billing kVADistribution investment CenterPoint recovers between full rate cases.
Energy Efficiency Cost Recovery Factor (EECRF)Per kWhCenterPoint's energy efficiency programs.
System restoration chargesPer billing kVARepays bonds the Public Utility Commission approved in 2025 to finance system restoration costs.
Other riders and creditsPer billing kVANuclear decommissioning, rate case expenses, temporary emergency generation, and tax-related credits.

What CenterPoint charges right now.

From the tariff sheets in force on October 31, 2026. Sites at or below 10 kVA pay per kWh; sites above 10 kVA pay mostly per kVA of demand, on the current month’s peak. IDR-metered sites pay higher fixed charges and transmission on 4CP kVA, noted in the table. The Texas prices page holds the same tables beside Oncor’s and the state averages.

CenterPoint, Secondary Service Less Than or Equal to 10 kVA. CenterPoint tariff sheet 6.1.1.1.2, 23rd revision; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$2.01 per monthFebruary 26, 2026
Metering charge$2.95 per monthFebruary 26, 2026
Distribution System Charge$0.017893 per kWhFebruary 26, 2026
Transmission Cost Recovery Factor (TCRF)$0.011506 per kWhSeptember 1, 2026
Distribution Cost Recovery Factor (DCRF)$0.005490 per kWhSeptember 30, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.004970 per kWhMarch 1, 2026
System Restoration Charge (Schedule SRC III)$0.002842 per kWhFebruary 26, 2026
System Restoration Charge (Schedule SRC II)$0.000627 per kWhSeptember 1, 2026
Temporary Emergency Electric Energy Facilities (Rider TEEEF)$0.000378 per kWhAugust 15, 2026
Rate Case Expenses Surcharge (Rider RCE)$0.000040 per kWhApril 28, 2025
Nuclear Decommissioning Charge (Rider NDC)$0.000006 per kWhApril 28, 2025
ADFIT Credit (Rider ADFITC II)($0.000023) per kWhSeptember 1, 2026
ADFIT Credit (Rider ADFITC III)($0.000417) per kWhFebruary 26, 2026
Added up$4.96 per month, fixed$0.043312 per kWh (4.33 cents)
CenterPoint, Secondary Service Greater Than 10 kVA, non-IDR metered. CenterPoint tariff sheet 6.1.1.1.3, 23rd revision; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$64.72 for IDR-metered sites$4.14 per monthFebruary 26, 2026
Metering charge$86.69 for IDR-metered sites$9.27 per monthFebruary 26, 2026
Distribution System Charge$4.893378 per billing kVAFebruary 26, 2026
Transmission Cost Recovery Factor (TCRF)$6.177655 per 4CP kVA for IDR-metered sites$4.342591 per NCP kVASeptember 1, 2026
Distribution Cost Recovery Factor (DCRF)$1.008963 per billing kVASeptember 30, 2026
System Restoration Charge (Schedule SRC III)$0.495587 per billing kVAFebruary 26, 2026
Temporary Emergency Electric Energy Facilities (Rider TEEEF)$0.133331 per billing kVAAugust 15, 2026
System Restoration Charge (Schedule SRC II)$0.110774 per billing kVASeptember 1, 2026
Rate Case Expenses Surcharge (Rider RCE)$0.008707 per billing kVAApril 28, 2025
Nuclear Decommissioning Charge (Rider NDC)$0.001460 per billing kVAApril 28, 2025
Energy Efficiency Cost Recovery Factor (EECRF)$0.000930 per kWhMarch 1, 2026
ADFIT Credit (Rider ADFITC II)($0.003930) per billing kVASeptember 1, 2026
ADFIT Credit (Rider ADFITC III)($0.072680) per billing kVAFebruary 26, 2026
Added up$13.41 per month, fixed$6.575590 per billing kVA$4.342591 per NCP kVA (the month’s 15-minute peak)$0.000930 per kWh (0.09 cents)

Worked month, as an illustration only: a non-IDR site with a 50 kVA peak, 15,000 kWh, pays about $573 in CenterPoint charges, or 3.8 cents per kWh before supply, taxes and fees.

How your peak is measured.

Your NCP kVA for the month is the kVA supplied during the 15-minute period of highest use in that billing month. Under CenterPoint’s tariff for this rate class, the billing kVA for the Distribution System Charge is the NCP kVA for the current billing month.

Our guide to demand charges explains the difference between demand and usage, and practical ways to lower a peak.

IDR metering and 4CP.

CenterPoint has two sets of customer and metering charges for this class: IDR-metered and non-IDR-metered. An IDR (interval data recorder) meter records usage in intervals. The IDR-metered charges apply to sites that have reached a peak above 700 kVA in any previous billing month, whatever meter they have.

For those sites, the Transmission Cost Recovery Factor is billed on 4CP kVA: the average of the site’s demand at the moment of ERCOT’s system peak in each of June, July, August and September of the previous year. CenterPoint updates it with the February billing month and keeps it fixed for a year. Other sites are billed on their monthly peak.

Houston vs Dallas: how CenterPoint and Oncor differ.

If you have sites in both Houston and Dallas-Fort Worth, the delivery charges on the two bills are built differently. Both come from tariffs approved by the Public Utility Commission of Texas.

Differences between Oncor and CenterPoint delivery charges for larger business sites
For larger business sitesOncor (Dallas-Fort Worth)CenterPoint (Houston)
Demand unitkWkVA
Larger rate class starts above10 kW10 kVA
Distribution charge priced onBilling kW; can be 80% of the highest peak in the past 11 monthsThe current month's peak (NCP kVA)
Distribution price per unitVaries with annual load factor above 20 kWOne price per kVA
4CP applies to sites that reached700 kW or more in any previous monthAbove 700 kVA in any previous month
4CP value updatedJanuary 1With the February billing month

Our guide to Oncor delivery charges covers the 80% ratchet and load factor in detail.

What you can and cannot change.

A new supply contract does not change CenterPoint’s delivery charges; they apply whichever provider you choose. What you can influence is the peak those charges are priced on: stagger equipment start-up, watch the demand line each month, and for sites near 700 kVA, plan for ERCOT’s summer peaks.

When we review a bill, we compare the supply charges and flag the delivery charges so you see the whole picture. For a Houston site, start with your ZIP and add your bill when you have it.

Common questions

What are CenterPoint delivery charges?
The charges CenterPoint Energy Houston Electric bills your retail electricity provider for delivering and metering power in the Houston area, under a tariff approved by the Public Utility Commission of Texas. They appear on your bill whichever provider you choose, and no provider can discount them.
Why are CenterPoint delivery charges higher in 2026?
Four sheets in CenterPoint's tariff changed in 2026: the TCRF (transmission) and Schedule SRC II (restoration bonds) on September 1, TEEEF (temporary emergency generation) on August 15, and DCRF (distribution investment between rate cases) on September 30. The amounts and dates are in the table above; compare them with the TDU section of two bills to see which moved for your meter.
Can a business avoid or reduce CenterPoint delivery charges?
Not by switching provider: they apply to every retail plan. Because the distribution charge is billed on this month's peak kVA with no ratchet, lowering your peak lowers next month's charge straight away. kVA also counts reactive power, so equipment with a poor power factor raises the kVA you are billed on.
How much are CenterPoint delivery charges for a business?
For a non-IDR site above 10 kVA: $13.41 a month fixed, $6.575590 per billing kVA, $4.342591 per NCP kVA and $0.000930 per kWh, from sheets effective February 26 to September 30, 2026; a 50 kVA, 15,000 kWh month is about $573. Sites at or below 10 kVA pay 4.33 cents per kWh plus $4.96 a month. Each line is in the table above with its sheet date.
Why does CenterPoint bill in kVA instead of kW?
CenterPoint measures demand in kilovolt-amperes (kVA), which counts all the power your equipment draws, including the part that does no useful work. So a site's kVA is never lower than its kW, and usually a little higher.
When is a business on CenterPoint's larger rate class?
When it is a non-residential site whose peak demand is above 10 kVA in the current month, or was above 10 kVA in any of the previous 11 months.
What is IDR metering at CenterPoint?
Sites that have reached a peak above 700 kVA in any previous billing month pay CenterPoint's IDR-metered customer and metering charges, and their transmission charge is billed on 4CP kVA, updated with the February billing month.

Sources and scope

Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.

Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.

Put it into practice

Have a contract to review?

Start with your business ZIP, business name and email. Add every page of your bill when you have it. With Box Energy, we compare available offers. No fee for our help.

Start my rate comparison

Before you choose

Make sense of your next contract.

Contract timing

Business electricity contract renewal: what happens when it ends

What happens when a business electricity contract ends in Texas, the 14-day notice and no-penalty rules for small commercial accounts, how early you can lock the next term, and what to have ready.

Read the guide
Quote comparison

How to compare commercial electricity quotes

How to line up business electricity quotes on the same basis: same meter, usage, start date and term, what each rate includes, what a fixed rate fixes, and what to check before you sign.

Read the guide
Bill basics

How to read a commercial electricity bill (Texas)

Usage, supply, delivery, demand and taxes: what each line on a business electric bill means, which one a new contract can change, and what to have ready before a review.

Read the guide
Demand charges

Demand charges: what they are and how to lower them (Texas)

Why a business pays for its highest 15 minutes of the month, how demand differs from usage, what a ratchet and 4CP do, and how to bring the peak down. Texas rules, sourced.

Read the guide
Delivery charges

Oncor delivery charges for businesses (2026)

What each Oncor delivery charge pays for, why 2026 business bills look different (new rates June 1, an interim surcharge from August, rider updates October 4), the 80% ratchet, and what you can change.

Read the guide
Calculator

Oncor demand ratchet calculator

Work out the demand Oncor bills a Texas business this month: the 80% ratchet, its 20 kW and 25% load factor exemptions, and your load factor band.

Read the guide
Prices and charges

Texas commercial electricity prices: averages and delivery charges (2026)

The average price Texas businesses pay (EIA, monthly) and the current Oncor and CenterPoint delivery charges for business sites, every figure dated to its tariff sheet, with a worked month.

Read the guide
Rate types

Fixed, variable or indexed: business electricity rates in Texas

What each rate type lets your supplier change, why a business under 50 kW can only buy fixed or variable, what a fixed rate still passes through, and what to ask when a larger site is offered an indexed or pass-through plan.

Read the guide
Load factor

Commercial electricity load factor: how to calculate it

Load factor compares a business's average demand with its peak. How to calculate it from three numbers on your bill, what 50% means, where it changes what you pay at Oncor, and how suppliers and ERCOT use it. With a calculator.

Read the guide
Bill basics

ESI ID: what it is and how a Texas business finds it

The ESI ID is the number that identifies each electricity service point in Texas. What it looks like (17 or 22 digits, by utility), where it is on the bill, how to look it up without one, and why a business with several sites has several.

Read the guide
Restaurant electricity

Put your restaurant’s rate beside the options.

Start with your business ZIP. Add your bill now or later. We compare available supply offers with Box Energy.

Start my comparison
Start my rate comparison