Skip to content
Wire&Watt

Energy field notes / Quote comparison

How to compare commercial electricity quotes

Two electricity quotes can show different numbers for the same cost. To compare them, put every offer on the same meter, usage, start date and contract length, then check what each rate includes: a supply-only rate, an all-in rate and a partly fixed offer are not the same price. This checklist goes through it in order.

By Wire & Watt Published Updated

Use the same starting information.

Put the same service address, meter, usage information and intended start date on every quote request. Keep the contract lengths visible. An offer for a different start or term answers a different question.

For a restaurant, tell the pricing team about changes such as a new walk-in cooler, longer opening hours or a second kitchen. The recent bill describes past usage; the people pricing the account also need to understand what is changing.

Collect the full offer and contract terms. A rate copied from an email subject or an advert is not enough information to choose a supply agreement.

Separate supply from delivery and the rest.

The supply charge covers the electricity you buy. In eligible competitive markets, that is the part you can compare across suppliers. Your utility delivers the electricity and has its own charges. Taxes and other bill items may also apply.

Supply

The contract you compare.

Check the price structure, included components, term and start date.

Delivery and other charges

Keep them in the calculation.

Read the utility charges, taxes and fees when assessing the whole bill.

Dividing the total bill by kilowatt-hours gives an average cost across those bill items. It is not automatically the supply rate to put beside a supplier quote. Read the labeled supply section and check whether a quoted offer includes or excludes delivery.

Put these details beside every offer.

Business electricity quote comparison checklist
CheckWhat to ask
Service and usageIs this for the same meter and the same usage information?
Supply rateWhich supply components are included, and which can change?
DeliveryIs utility delivery included in the displayed price or billed separately?
Start and termWhen does the contract start, and how long does it run?
Fees and conditionsAre there recurring fees, usage conditions or charges for ending early?
RenewalWhat happens at expiry, and is notice required?
Quote validityUntil when can the supplier accept this offer?

Ask for an unclear item to be explained in writing. If two offers include different components, have the pricing team reconcile them before ranking the headline rates.

Ask exactly what is fixed.

A fixed supply offer and an offer with adjustable components can leave the business with different exposure. Check whether capacity, transmission or other supply costs are bundled or can pass through under the contract. A supplier’s plan name alone does not answer that.

Even when the supply rate is fixed, usage changes the monthly cost. The utility’s delivery charges and applicable taxes also need to be considered. Treat “fixed” as a description of specified contract components, rather than a promise that the total bill will stay the same.

Check the contract before you sign.

Match the supplier, meter, rate structure, term and start date to the offer you chose. Read the fees, usage conditions and renewal provisions. Keep the accepted agreement with the current one so the changeover can be checked.

If your present contract still has time to run, use our contract renewal guide to check the dates first. A lower headline rate does not settle whether changing early makes sense.

Wire & Watt works with Box Energy to compare available supply offers for your location. You can start a restaurant rate comparison without your bill and add every page later. There is no separate fee for our help; the supplier you choose pays us. Nothing changes unless you sign, and a lower rate is not guaranteed.

Common questions

How do I compare business electricity quotes?
Put every offer on the same basis: the same meter, usage, start date and contract length. Then check which supply components each rate includes, whether delivery is included, any fees, and what happens at expiry.
Is my total bill divided by kWh my supply rate?
No. That gives an average across supply, delivery, taxes and fees. Compare a quote against the labeled supply section of your bill instead.
Does a fixed rate mean a fixed bill?
No. A fixed rate fixes the contract components it names. Your monthly cost still changes with usage, and the utility's delivery charges and taxes also apply.
What should I check before signing?
That the supplier, meter, rate structure, term and start date match the offer you chose, and the fees, usage conditions and renewal provisions in the contract.

Sources and scope

Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.

Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.

Put it into practice

Have a contract to review?

Start with your business ZIP, business name and email. Add every page of your bill when you have it. With Box Energy, we compare available offers. No fee for our help.

Start my rate comparison

Before you choose

Make sense of your next contract.

Contract timing

Business electricity contract renewal: what happens when it ends

What happens when a business electricity contract ends in Texas, the 14-day notice and no-penalty rules for small commercial accounts, how early you can lock the next term, and what to have ready.

Read the guide
Bill basics

How to read a commercial electricity bill (Texas)

Usage, supply, delivery, demand and taxes: what each line on a business electric bill means, which one a new contract can change, and what to have ready before a review.

Read the guide
Demand charges

Demand charges: what they are and how to lower them (Texas)

Why a business pays for its highest 15 minutes of the month, how demand differs from usage, what a ratchet and 4CP do, and how to bring the peak down. Texas rules, sourced.

Read the guide
Delivery charges

Oncor delivery charges for businesses (2026)

What each Oncor delivery charge pays for, why 2026 business bills look different (new rates June 1, an interim surcharge from August, rider updates October 4), the 80% ratchet, and what you can change.

Read the guide
Calculator

Oncor demand ratchet calculator

Work out the demand Oncor bills a Texas business this month: the 80% ratchet, its 20 kW and 25% load factor exemptions, and your load factor band.

Read the guide
Delivery charges

CenterPoint delivery charges for businesses (2026)

What each CenterPoint delivery charge on a Houston business bill pays for, why it is billed in kVA, which riders changed in 2026, IDR metering and 4CP, and how it differs from Oncor.

Read the guide
Prices and charges

Texas commercial electricity prices: averages and delivery charges (2026)

The average price Texas businesses pay (EIA, monthly) and the current Oncor and CenterPoint delivery charges for business sites, every figure dated to its tariff sheet, with a worked month.

Read the guide
Rate types

Fixed, variable or indexed: business electricity rates in Texas

What each rate type lets your supplier change, why a business under 50 kW can only buy fixed or variable, what a fixed rate still passes through, and what to ask when a larger site is offered an indexed or pass-through plan.

Read the guide
Load factor

Commercial electricity load factor: how to calculate it

Load factor compares a business's average demand with its peak. How to calculate it from three numbers on your bill, what 50% means, where it changes what you pay at Oncor, and how suppliers and ERCOT use it. With a calculator.

Read the guide
Bill basics

ESI ID: what it is and how a Texas business finds it

The ESI ID is the number that identifies each electricity service point in Texas. What it looks like (17 or 22 digits, by utility), where it is on the bill, how to look it up without one, and why a business with several sites has several.

Read the guide
Restaurant electricity

Put your restaurant’s rate beside the options.

Start with your business ZIP. Add your bill now or later. We compare available supply offers with Box Energy.

Start my comparison
Start my rate comparison