Energy field notes / Data
Oncor vs CenterPoint vs AEP vs TNMP delivery charges
The same business pays $573 a month for electricity delivery in CenterPoint's area and $819 in TNMP's, 43% more, for a 50 kW site using 15,000 kWh. Delivery charges are set by the utility that owns the wires at the address and are the same whichever supplier the business picks. Below: three site sizes in each Texas delivery area, the per-unit totals behind them, and every charge as a CSV. Figures from the utilities' current tariffs, checked October 31, 2026 (Oncor, CenterPoint) and November 2, 2026 (AEP Texas, TNMP).
By Wire & Watt Published
Three sites, five delivery areas.
Monthly delivery charges for the same three business sites in each Texas competitive delivery area. Each site’s demand is also its billed demand, and each runs at a load factor of about 42% over a 30-day month.
| Delivery area | Small shop or office20 kW, 6,000 kWh | Restaurant-sized site50 kW, 15,000 kWh | Larger site200 kW, 60,000 kWh |
|---|---|---|---|
| Oncor | $323.815.40 cents per kWh | $742.054.95 cents per kWh | $2,833.224.72 cents per kWh |
| CenterPoint | $237.353.96 cents per kWh | $573.273.82 cents per kWh | $2,252.853.75 cents per kWh |
| AEP Texas, former Central area | $277.944.63 cents per kWh | $661.844.41 cents per kWh | $2,581.374.30 cents per kWh |
| AEP Texas, former North or McAllen/Mission area | $270.384.51 cents per kWh | $642.944.29 cents per kWh | $2,505.764.18 cents per kWh |
| TNMP | $338.105.64 cents per kWh | $818.775.46 cents per kWh | $3,222.115.37 cents per kWh |
The order is the same at all three sizes in this comparison, but it is not a ranking for every site: a ratchet, a low load factor, a power factor below 95% or 4CP billing all move a real bill. To work out your own month from your bill, use the delivery charge calculator.
The per-unit totals.
Every charge for the larger business class of each utility, added up by the unit it is billed on. These are what multiply a site’s own numbers; each line and its tariff sheet is in the TDU guide and the CSV.
| Utility, larger class | Per month | Per billing kW | Per peak kW | Per kWh |
|---|---|---|---|---|
| Oncor | $44.99 | $9.171265 | $4.606104 | $0.000546 |
| CenterPoint (per kVA) | $13.41 | $6.575590 | $4.342591 | $0.000930 |
| AEP Texas, former Central area | $22.00 | $8.434183 | $4.139791 | $0.000743 |
| AEP Texas, rest of its area | $22.00 | $8.056107 | $4.139791 | $0.000743 |
| TNMP | $17.66 | $9.296558 | $6.257382 | $0.001561 |
Oncor’s figure uses its lowest distribution price band; sites over 20 kW with an annual load factor of 25% or less pay more per kW. TNMP’s uses its price for a load factor above 25%. The larger class starts above 10 kW at Oncor and AEP Texas, above 10 kVA at CenterPoint and above 5 kW at TNMP.
How the figures are worked out.
- Source: each utility’s Tariff for Retail Delivery Service, every line dated to the sheet it comes from. Nothing is estimated; the code that adds the lines up is the same as the calculator’s, and the site will not build if the two disagree.
- What is included: every recurring delivery charge and rider we carry for the larger business class, including credits. Not included: supply, taxes, fees, one-off utility charges, credits for a customer-owned meter, and AEP Texas’s transition-charge refund, whose current status we could not confirm.
- Assumptions: billed demand equals the month’s peak (no ratchet), the same figure is used in kVA at CenterPoint, and no site is billed on 4CP.
- Temporary lines: Oncor’s interim surcharge runs through December 2026, and TNMP’s interim surcharge has no amount yet. When either changes, the next monthly update shows it.
Download the data.
Texas business delivery charges (CSV): one row per charge for Oncor, CenterPoint, AEP Texas and TNMP, small and larger business classes, with the amount, unit, tariff sheet, effective date, the area it applies in and the date we checked it. We update it with every monthly tariff check. Free to use; please link to this page as the source.
Common questions
- Which Texas utility has the lowest delivery charges for a business?
- For the three sites compared here, CenterPoint. A 50 kW site using 15,000 kWh pays $573.27 a month there against $818.77 at TNMP, at current tariffs. CenterPoint bills demand in kVA, so a site with a low power factor reads higher there than this kW comparison shows, and a business cannot choose its delivery utility: the address decides.
- How much more does a business pay in the TNMP area?
- For the 50 kW, 15,000 kWh site, $246 a month or about $2,946 a year more than in the CenterPoint area, 43% in all. The gap comes from regulated delivery charges, before any supply price, taxes or fees.
- Does changing electricity supplier change delivery charges?
- No. The supplier bills them for the delivery utility at the tariff amount and may not bill more. What a business can change is the load the tariff measures: its monthly peak, its load factor band and its power factor.
- How often do Texas delivery charges change?
- Riders change on their own dates between rate cases: the transmission and distribution cost recovery factors can each move up to twice a year, and a rate case resets base rates. We re-check every tariff on the first of each month and update this page and the CSV.
- Can I use this data?
- Yes. The amounts come from public utility tariffs. Use the figures or the CSV freely; please link to this page as the source so readers can see the dates and method.
Sources and scope
Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.
Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.
- Oncor Tariff for Retail Delivery Service, 6.1.1.1.2 and 6.1.1.1.3 (revision 12, effective June 1, 2026) (opens in a new tab)
- Oncor Tariff for Retail Delivery Service, riders TCRF and DCRF (revised Oct. 4, 2026) and Rider IS, Interim Surcharge (effective Aug. 1, 2026, through December 2026) (opens in a new tab)
- CenterPoint Energy Houston Electric Tariff for Retail Delivery Service, 6.1.1.1.3 (revision 23, effective Feb. 26, 2026) (opens in a new tab)
- CenterPoint Energy Houston Electric Tariff for Retail Delivery Service, Rider TEEEF (revised Aug. 15, 2026) and Rider DCRF (revised Sept. 30, 2026) (opens in a new tab)
- AEP Texas Tariff for Electric Delivery Service, 6.1.1.1.2, 6.1.1.1.3 and riders (file effective Sept. 29, 2026) (opens in a new tab)
- Texas-New Mexico Power Tariff for Retail Delivery Service, 6.1.1.1.2, 6.1.1.1.3 and riders (effective Sept. 13, 2026, Docket 58964) (opens in a new tab)
- Texas PUC Substantive Rule 25.479(c)(2) and (f): TDU charge labels on bills, never more than the tariff, and pass-through of one-off TDU charges (Cornell Law School, Legal Information Institute) (opens in a new tab)