Power factor is the share of the power a site draws that does useful work: real power in kW divided by apparent power in kVA. The tariffs of Oncor, CenterPoint, AEP Texas and TNMP carry the same rule: below 95% lagging, the utility may bill demand as actual kW x 0.95 / power factor. CenterPoint bills demand in kVA, so any power factor below 100% raises the bill there. A site with a 100 kW peak at 85% power factor is billed on 111.76 kW where the 95% rule is applied, and on 117.65 kVA at CenterPoint.
By Wire & Watt Published
What power factor is.
All four Texas delivery utilities define it the same way: “The ratio of real power, measured in kW, to apparent power, measured in kVA, for any given load and time, generally expressed as a percentage.”
power factor = kW ÷ kVA
Real power (kW) is what runs the equipment. Motors, transformers and some lighting also draw reactive power, measured in kVAR, to build their magnetic fields; it does no work but still has to be carried by the wires. Apparent power (kVA) is the total of the two, so the more reactive power a site draws, the lower its power factor. The U.S. Department of Energy names electric motors, transformers and high-intensity discharge lighting as the usual causes. A site with 100 kW of real power drawing 142 kVA has a power factor of 70%.
The 95% rule in Texas tariffs.
The Public Utility Commission of Texas requires every investor-owned delivery utility to use Chapters 1, 3, 4 and 5 of the standard tariff “exactly as written” (Substantive Rule 25.214(c)). Section 5.5.5 of Chapter 5 is the power factor rule, so it reads word for word the same at Oncor, CenterPoint, AEP Texas and TNMP. Section 5.5.5 says that if a site’s power factor is “less than 95% lagging as measured at the Meter”, the utility may require the customer to install equipment on its side of the meter to bring it between unity and 95%, or may increase the billed demand:
adjusted NCP kW = (actual monthly NCP kW × 0.95) ÷ that month’s power factor
The adjusted figure is used to set the billing kW, so every charge priced per kW rises with it. A large site billed on 4CP has each month’s demand at the ERCOT peak adjusted the same way (our 4CP guide explains that charge). If a site’s power factor causes problems for other customers and it does not correct it after notice, the utility may install correction equipment on its own system and bill the customer for it.
The tariff says the utility “may” do both. We could not find public data on how often each utility applies the adjustment, so treat it as a power the utility has, not a charge every site pays.
How each utility applies it.
| Utility | Demand billed in | What the tariff says |
|---|---|---|
| Oncor | kW | Section 5.5.5: below 95% lagging, demand may be raised to kW x 0.95 / power factor. Oncor can also install correction equipment and bill its cost (discretionary charge DD22) if the customer does not correct it. |
| CenterPoint | kVA | Demand is billed in kVA, which already includes power factor: kVA = kW / power factor. Every point below 100% raises billed demand, with no 95% allowance. Section 5.5.5 also applies. |
| AEP Texas | kW | The AEP Texas business rate refers to section 5.5.5: below 95% lagging, demand may be raised to kW x 0.95 / power factor. |
| TNMP | kW | The TNMP business rate (above 5 kW) says demand will be raised to kW x 0.95 / power factor below 95%, using the month's average power factor from metered kWh and kVARh. |
The difference that matters most is CenterPoint’s. Because it measures demand in kVA, power factor is already inside every demand charge on a Houston business bill, from the first point below 100%. At Oncor, AEP Texas and TNMP, which measure kW, power factor only matters below 95%. Our CenterPoint and Oncor guides list the demand charges it multiplies.
A worked example.
A site’s peak for the month is 100 kW of real power at an 85% power factor.
- Oncor, AEP Texas or TNMP, if the 95% rule is applied: (100 × 0.95) ÷ 0.85 = 111.76 kW billed instead of 100. At Oncor’s current charges per billing kW for a site over 10 kW, at the lowest distribution price band, that is $107.90 more a month.
- CenterPoint: 100 ÷ 0.85 = 117.65 kVA billed. At its current per-kVA charges for a site over 10 kVA that is $192.67 a month more than the same site at 100% power factor, and $135.21 more than at 95% (105.26 kVA).
To lift that site from 85% to 95%, about 29.11 kVAR of reactive power has to be offset, which is the starting point for sizing correction; the real sizing is an engineer’s job. Charges are from each utility’s tariff as we last checked them on October 31, 2026; Oncor’s figure leaves out its transmission charge (TCRF), because we could not confirm whether it is billed on the adjusted kW.
Finding it on your bill.
The Department of Energy notes that power factor is usually listed on business bills, but the adjustment itself is rarely shown as its own line: it appears as a billed demand higher than the metered one. Compare the metered kW with the billed kW. If billed is higher, the cause is either a ratchet or a power factor adjustment; our ratchet calculator tells you whether a ratchet explains it. At CenterPoint, compare the kVA billed with the kW the bill or your meter data shows. TNMP works out the month’s average power factor from metered kWh and kVARh, so a TNMP bill with kVARh on it lets you check the figure yourself.
How to correct it.
- Capacitors: the Department of Energy’s first recommendation. Static capacitors offset a steady base load; switched capacitors follow a load that changes through the day. The tariff wants them on your side of the meter, bringing power factor between unity and 95%.
- Fewer idling motors: lightly loaded or idling motors lower power factor, so switch off equipment that is not working and replace failed motors with efficient ones.
- Get it sized: Oak Ridge National Laboratory warns that over-correcting a motor can damage the motor and the capacitors, and that capacitors cannot go on the output of a variable speed drive. An electrical engineer or the capacitor supplier should size and place them.
A supply contract does not change power factor, but the delivery charges it affects come with every bill whichever supplier you choose. Start with your business ZIP and email, and add every page of a recent bill.
Common questions
- What is the power factor penalty on an electricity bill?
- In the Oncor, CenterPoint, AEP Texas and TNMP areas, a site whose power factor is below 95% lagging can have its billed demand raised to actual kW x 0.95 / power factor, under section 5.5.5 of the delivery utility's tariff. The adjustment is not a separate line: it shows up as a higher billed kW, so every charge priced per kW goes up.
- Is a 0.95 power factor good?
- 95% is the line in the Oncor, CenterPoint, AEP Texas and TNMP tariffs: at 95% or above, Oncor, AEP Texas and TNMP do not raise billed demand. At CenterPoint, which bills in kVA, a 95% power factor still bills about 5.3% more kVA than the site's kW; only 100% removes the difference.
- How is the power factor adjustment calculated?
- Power factor adjusted NCP kW = (actual monthly NCP kW x 0.95) / that month's power factor. A 100 kW peak at 85% becomes 95 / 0.85 = 111.76 kW. The same formula applies to a large site's 4CP demand.
- Is kVA the same as kW?
- Only at a power factor of 100%. kW is real power, kVA is apparent power, and power factor = kW / kVA. At 85%, a 100 kW load draws 117.65 kVA.
- Does CenterPoint charge for low power factor?
- In effect, yes, on every bill: CenterPoint prices its business demand charges per kVA, and kVA rises as power factor falls. There is no 95% allowance, so a site at 85% is billed on 17.6% more demand than its kW.
- What causes low power factor?
- Inductive loads, according to the U.S. Department of Energy: electric motors, transformers and high-intensity discharge lighting. Lightly loaded or idling motors make it worse.
- How do I fix a low power factor?
- The usual fix is capacitors on your side of the meter, sized by an electrical engineer, plus running fewer idle or lightly loaded motors. The tariff target is between unity and 95% lagging, measured at the meter.
Sources and scope
Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.
Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.
- Oncor Tariff for Retail Delivery Service, 6.1.1.1.2 and 6.1.1.1.3 (revision 12, effective June 1, 2026) (opens in a new tab)
- CenterPoint Energy Houston Electric Tariff for Retail Delivery Service, 6.1.1.1.3 (revision 23, effective Feb. 26, 2026) (opens in a new tab)
- AEP Texas Tariff for Retail Delivery Service, section 5.5.5 and 6.1.1.1.3 (power factor) (opens in a new tab)
- Texas-New Mexico Power Tariff for Retail Delivery Service, section 5.5.5 and 6.1.1.1.3 (revision 14, effective Sept. 13, 2026) (opens in a new tab)
- Texas PUC Substantive Rule 25.214(c): every investor-owned delivery utility uses Chapters 1, 3, 4 and 5 of the standard tariff exactly as written (Cornell Law School, Legal Information Institute) (opens in a new tab)
- U.S. Department of Energy, Motor Challenge fact sheet: Reducing Power Factor Cost (opens in a new tab)
- U.S. Department of Energy: Understanding Your Utility Bills, Electricity (2021) (opens in a new tab)