A TDU delivery charge is what the utility that owns the poles and wires at your address charges to bring electricity to your meter. In Texas's competitive areas that utility is Oncor, CenterPoint, AEP Texas or TNMP. The Public Utility Commission of Texas sets its prices in a tariff, and your supplier passes them through at no more than the tariff amount, whichever supplier you choose. For a business site above 10 kW (5 kW at TNMP), most of the charge is billed on the month's peak demand. Below: a calculator that checks one month of your own bill, every current AEP Texas and TNMP business charge, and one month compared across all four utilities.

By Wire & Watt Published Updated

What a TDU is.

TDU stands for transmission and distribution utility. Texas law defines it as a company that owns or operates the equipment that carries electricity in a competitive power region, and it excludes city-owned utilities and electric cooperatives (Utilities Code 31.002(19); PUCT Rule 25.5). In these areas the TDU and the company that sells you electricity are separate businesses: you pick the retail electric provider, and the TDU at your address delivers whichever one you pick. AEP Texas puts it this way: it “provides regulated energy delivery service to consumers, regardless of which Retail Electric Provider (REP) they choose.”

You will also see TDSP, transmission and distribution service provider. TDSP is the industry’s word for the same companies, not a separate charge.

Which utility delivers to your site.

Your bill names it, and the ESI ID on the bill identifies the service point it delivers to (our ESI ID guide shows how to read one). Each utility splits business sites into a small class billed per kWh and a larger class billed mostly on demand, and the split is not the same everywhere:

Business delivery classes at the four Texas competitive-area utilities, from each tariff’s rate schedules
UtilityDemand-billed class startsDemand measured inCurrent charges
OncorAbove 10 kWkWOncor guide
CenterPointAbove 10 kVAkVACenterPoint guide
AEP TexasAbove 10 kWkWThis page
TNMPAbove 5 kWkWThis page

At AEP Texas, a site whose monthly peak goes above 10 kW moves to the larger class “for a period of not less than twelve months.” CenterPoint measures demand in kVA, which already includes power factor; our power factor guide explains what that costs.

Calculator

Check one month of delivery charges

Use the numbers printed on one business electricity bill. Nothing you enter leaves this page.

Named in the TDU or delivery section of the bill.

Does the bill charge delivery per kW?

Choose Yes if the delivery section lists a kW quantity.

The usage for the billing period.

The kW the delivery charges are priced on. It already includes any ratchet or power factor adjustment.

The actual or metered kW. Leave blank if the bill shows one figure.

Set by the annual load factor; the ratchet calculator works it out. “Not sure” uses the lowest price.

Enter the kWh and the billed kW to see the charges.

What each delivery line pays for.

The PUCT’s bill rule names these charges (“TDU Delivery Charges”, “TDU Surcharges” for the riders), lets a provider show them as one total or line by line, lets it name the utility, and says the amount billed “must not exceed the amount of the TDU tariff charge(s)” (Rule 25.479(c)(2)). One-off utility charges, such as a reconnection, can be passed through as well (25.479(f)). Line by line, a business delivery bill is made of:

What each TDU delivery line pays for
LineWhat it pays for
Customer and metering chargesFixed amounts per retail customer (AEP Texas) or per ESI ID (TNMP) every month, whatever the site uses. A site that is closed for a month still pays them.
Distribution System ChargeThe base price for the local wires, part of the utility's base rates. Per kWh for small sites; per kW of demand above the class threshold.
Transmission Cost Recovery Factor (TCRF)Passes through changes in what the utility pays for the high-voltage transmission network, as approved by the PUCT and never more than its actual cost (Rule 25.193). At AEP Texas and TNMP the base transmission charge is $0.00, so all of transmission sits in this line. Sites at 700 kW and up (over 700 kVA at CenterPoint) pay it on 4CP.
Distribution Cost Recovery Factor (DCRF)Recovers distribution investment made since the last rate case. Texas law allows it to change up to twice a year, with 45 days' notice to retail providers (Utilities Code 36.210). TNMP's went back to $0.00 when its new base rates took effect.
Energy Efficiency Cost Recovery Factor (EECRF)Pays for the utility's energy efficiency programs. TNMP's tariff calculates it annually, and the current factors at all four utilities took effect March 1, 2026.
System restoration and hurricane chargesRepay the cost of restoring the system after storms: AEP Texas's Rider SRC (system restoration bonds, PUCT Docket 49308), CenterPoint's SRC II and SRC III, and TNMP's Rider HCRF, which recovers $20.5 million of Hurricane Beryl costs over about five years (Docket 58964).
Rate case expense and interim surchargesRecover the cost of the rate case itself, and the gap between old and new rates while a case was decided. Oncor's Rider IS runs through December 2026; TNMP's Rider IS has no amount yet.
Nuclear decommissioning, mobile generation and creditsSmaller lines: nuclear decommissioning (AEP Texas's former Central area, CenterPoint), mobile generation riders (Oncor's MG, CenterPoint's TEEEF, AEP's Mobile TEEEF) and credits, shown in parentheses.

AEP Texas delivery charges for business sites.

AEP Texas has one set of base rates for its whole area, but four lines apply only where AEP Texas Central used to serve: the system restoration charge, nuclear decommissioning, the ADFIT credit and a transition-charge refund. AEP Texas does not bill these four lines in the former AEP Texas North area or the former Oncor McAllen/Mission area. The tables mark them and add the charges up both ways. Left out: the transition-charge refund (Rider TC-3), a credit the tariff expected to last about two months, whose current status we could not confirm; a monthly credit for a customer-owned meter; and riders currently at zero. Read from the tariff on November 2, 2026.

AEP Texas, Secondary Service Less Than or Equal to 10 kW. AEP Texas tariff sheet 6.1.1.1.2, first revision; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$1.45 per monthOctober 1, 2024
Metering charge$4.21 per monthOctober 1, 2024
Distribution System Charge$0.026454 per kWhOctober 1, 2024
Transmission Cost Recovery Factor (TCRF)$0.009298 per kWhSeptember 29, 2026
Distribution Cost Recovery Factor (DCRF)$0.005594 per kWhSeptember 29, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.000810 per kWhMarch 1, 2026
Mobile Temporary Emergency Electric Energy Facilities (Rider Mobile TEEEF)$0.000630 per kWhSeptember 1, 2026
System Restoration Charge (Rider SRC)Former AEP Texas Central area only$0.001515 per kWhAugust 28, 2026
Nuclear Decommissioning Charge (Rider NDC)Former AEP Texas Central area only$0.000174 per kWhMay 30, 2024
ADFIT Credit (Rider ADFIT)Former AEP Texas Central area only($0.000083) per kWhAugust 28, 2026
Added up, former AEP Texas Central area$5.66 per month, fixed$0.044392 per kWh (4.44 cents)
Added up, rest of the area$5.66 per month, fixed$0.042786 per kWh (4.28 cents)
AEP Texas, Secondary Service Greater Than 10 kW. AEP Texas tariff sheet 6.1.1.1.3, first revision; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$2.28 per monthOctober 1, 2024
Metering charge$19.72 per monthOctober 1, 2024
Distribution System ChargeBilled on the month's 15-minute peak; AEP's 80% ratchet applies only to the transition, nuclear decommissioning, system restoration and ADFIT riders$7.148000 per billing kWOctober 1, 2024
Transmission Cost Recovery Factor (TCRF)$6.232736 per average 4CP kW for sites that have reached 700 kW$4.139791 per NCP kWSeptember 29, 2026
Distribution Cost Recovery Factor (DCRF)$0.735577 per billing kWSeptember 29, 2026
Mobile Temporary Emergency Electric Energy Facilities (Rider Mobile TEEEF)$0.172530 per billing kWSeptember 1, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.000743 per kWhMarch 1, 2026
System Restoration Charge (Rider SRC)Former AEP Texas Central area only$0.347697 per billing kWAugust 28, 2026
Nuclear Decommissioning Charge (Rider NDC)Former AEP Texas Central area only$0.046998 per billing kWMay 30, 2024
ADFIT Credit (Rider ADFIT)Former AEP Texas Central area only($0.016619) per billing kWAugust 28, 2026
Added up, former AEP Texas Central area$22.00 per month, fixed$8.434183 per billing kW$4.139791 per NCP kW (the month’s 15-minute peak)$0.000743 per kWh (0.07 cents)
Added up, rest of the area$22.00 per month, fixed$8.056107 per billing kW$4.139791 per NCP kW (the month’s 15-minute peak)$0.000743 per kWh (0.07 cents)

One difference from Oncor: AEP Texas bills its distribution charge on the month’s own 15-minute peak. The AEP Texas 80% ratchet applies only to the four former-Central lines, so a summer peak does not hold the main distribution charge up for the rest of the year.

TNMP delivery charges for business sites.

Texas-New Mexico Power delivers to more than 280,000 homes and businesses. New base rates from its first rate filing in seven years (PUCT Docket 58964) took effect September 13, 2026, which reset its DCRF to $0.00 and set a rider recovering Hurricane Beryl restoration costs. The TNMP business class starts above 5 kW, and its distribution price per kW depends on the site’s annual load factor. Read from the tariff on November 2, 2026.

TNMP, Secondary Service Less Than or Equal to 5 kW. TNMP tariff sheet 6.1.1.1.2, revision 14; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$1.75 per monthSeptember 13, 2026
Metering charge$6.40 per monthSeptember 13, 2026
Distribution System Charge$0.002980 per kWhSeptember 13, 2026
Transmission Cost Recovery Factor (TCRF)$0.007286 per kWhSeptember 1, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.001897 per kWhMarch 1, 2026
Hurricane Cost Recovery Factor (Rider HCRF)$0.000591 per kWhSeptember 13, 2026
Rate Case Expense (Rider RCE)$0.000114 per kWhSeptember 13, 2026
Distribution Cost Recovery Factor (DCRF)Reset to zero with the new base rates$0.000000 per kWhSeptember 13, 2026
Added up$8.15 per month, fixed$0.012868 per kWh (1.29 cents)
TNMP, Secondary Service Greater Than 5 kW, non-IDR metered. TNMP tariff sheet 6.1.1.1.3, revision 14; riders from their own sheets.
ChargeAmountSheet effective
Customer charge$2.45 per monthSeptember 13, 2026
Metering charge$15.21 per monthSeptember 13, 2026
Distribution System ChargeAnnual load factor above 25%; $9.522580 per NCP kW at 25% or less, where the 80% ratchet does not apply$9.262411 per billing kWSeptember 13, 2026
Transmission Cost Recovery Factor (TCRF)$8.305264 per 4CP kW for IDR-metered sites (700 kW and up)$6.065473 per NCP kWSeptember 1, 2026
Hurricane Cost Recovery Factor (Rider HCRF)Hurricane Beryl restoration costs, spread over about five years$0.191909 per NCP kWSeptember 13, 2026
Rate Case Expense (Rider RCE)$0.034147 per billing kWSeptember 13, 2026
Energy Efficiency Cost Recovery Factor (EECRF)$0.001561 per kWhMarch 1, 2026
Distribution Cost Recovery Factor (DCRF)Reset to zero with the new base rates$0.000000 per billing kWSeptember 13, 2026
Interim Surcharge (Rider IS)Amount and start date are blank in the September 13, 2026 tariff$0.000000 per billing kWNot yet set
Added up$17.66 per month, fixed$9.296558 per billing kW$6.257382 per NCP kW (the month’s 15-minute peak)$0.001561 per kWh (0.16 cents)

TNMP’s 80% ratchet does not apply to a site whose annual load factor is 25% or less, or whose peak in the latest 12 months is 20 kW or less. The TNMP interim surcharge is in the tariff with the amount left blank, so a new line may appear once the PUCT sets it.

One month at all four utilities.

Take one business site: a 50 kW peak that is also its billing demand (no ratchet in play), 15,000 kWh in the month, a load factor of about 42% in a 30-day month, not on 4CP. The same 50 figure is used in kVA at CenterPoint. Delivery charges only; supply, taxes and fees come on top.

One month’s delivery charges for the same site, Oncor and CenterPoint as checked October 31, 2026, AEP Texas and TNMP as checked November 2, 2026
UtilityDemand-basedPer kWhFixedTotalCents per kWh
Oncor$688.87$8.19$44.99$742.054.95
CenterPoint$545.91$13.95$13.41$573.273.82
AEP Texas, former Central area$628.70$11.15$22.00$661.844.41
AEP Texas, rest of its area$609.79$11.15$22.00$642.944.29
TNMP$777.70$23.42$17.66$818.775.46

For this site the demand-based lines are 93% of the Oncor total, which is why the peak matters more than the kWh. Four things move these figures for a real site:

  • Oncor’s interim surcharge is $49.89 of the Oncor total and ends with December 2026.
  • CenterPoint bills kVA: at a 90% power factor the same 50 kW reads 55.56 kVA, adding $60.66.
  • Load factor: at 25% or less, TNMP charges $13.01 more on distribution for this demand, and Oncor up to $144.99 more.
  • Ratchets: at Oncor and TNMP, a higher peak earlier in the year can set the billed kW for 11 months; our ratchet calculator shows by how much.

Three site sizes in every delivery area, with all the charges as a downloadable CSV, are in our Texas delivery charges comparison.

Why delivery charges rise.

Delivery prices change between rate cases on their own dates, so a bill can rise with no change at the site. PUCT Rule 25.193 has the TCRF updated on March 1 and September 1, yet in 2026 Oncor’s changed on October 4 and AEP Texas’s on September 29, so check the date on each sheet rather than the calendar. The DCRF can change up to twice a year. A rate case resets the base rates and can bring riders of its own: an interim surcharge at Oncor, a rate-case expense rider and Hurricane Beryl recovery at TNMP.

The site itself is the other cause. Above the class threshold, one busy 15-minute interval sets most of the month’s delivery charge, and a ratchet can keep it there. To find which it is, put two bills side by side and compare the billed kW and each TDU line; our bill guide shows where each one sits.

What a business can change.

Switching supplier does not lower delivery charges, and there is no price to negotiate with the utility in the ordinary course: Texas law says a utility may not charge “a greater or lesser compensation” than its filed tariff prescribes, subject to exceptions the statute sets out, and the regulator sets rates by customer class (Utilities Code 36.001 and 36.004). What the tariff measures is your load, and that you can change:

  • The monthly peak. Stagger equipment start-ups and big loads; our demand charges guide covers how.
  • The ratchet. At Oncor and TNMP one summer peak can set 11 months of billed demand; TNMP exempts sites at or below 25% load factor or 20 kW.
  • The load factor band. Oncor and TNMP price distribution by annual load factor; the load factor calculator shows your band.
  • Power factor. Below 95% the utility may raise billed demand, and CenterPoint bills kVA throughout (power factor guide).
  • 4CP. A site that reaches 700 kW pays transmission on its demand at ERCOT’s four summer peaks (4CP guide).

Fixed rates and TDU changes.

For a small business, a fixed rate does not freeze delivery. PUCT Rule 25.475(b)(5) lets the price of a fixed-rate product vary “solely to reflect actual changes in TDU charges”, ERCOT or Texas Regional Entity administrative fees, and costs from new laws. The rule covers residential and small commercial customers, and small commercial means a peak under 50 kW in any 12-month period (Rule 25.471(d)(11)). Above 50 kW the contract decides, so read its pass-through clause before signing; our fixed, variable and indexed rates guide covers what each type fixes.

SCRF is not a TDU charge.

People searching for TDU charges often meet SCRF. SCRF appears on electric cooperative bills, not on Oncor, CenterPoint, AEP Texas or TNMP bills: none of their tariffs contains it. Co-ops use it to repay bonds issued under Senate Bill 1580 (2021), which let them finance the extraordinary costs of Winter Storm Uri in February 2021, and the law makes the charge apply to every customer on the co-op’s system. Co-ops spell the letters out differently (Navasota Valley says Securitization Cost Recovery Factor, CoServ Securitized Charges Recovery Factor) and CoServ reviews it at least every six months. The nearest TDU equivalent is a system restoration charge, such as AEP Texas’s Rider SRC above.

Delivery is regulated; supply is the part a business can compare. Start with your business ZIP and email, and add every page of a recent bill for each site.

Common questions

What is a TDU delivery charge?
The regulated charge from your transmission and distribution utility (Oncor, CenterPoint, AEP Texas or TNMP) for delivering electricity over its poles and wires to your meter. A TDU delivery charge is set in the utility's tariff, appears on every monthly bill, and stays the same whichever retail provider you choose. Your provider bills it for the utility and may not charge more than the tariff amount.
Who has the lowest TDU delivery charges?
Which utility is lowest depends on the site, and you cannot choose: your address decides the utility. For one business site with a 50 kW peak and 15,000 kWh in a month, no ratchet in play, current tariffs put delivery at $573.27 at CenterPoint, $642.94 at AEP Texas (rest of its area), $661.84 at AEP Texas (former Central area), $742.05 at Oncor, $818.77 at TNMP. A different load factor, ratchet, power factor or 4CP status changes the order.
What is the average TDU charge in Texas?
We do not publish one, because a business's delivery charge depends mostly on its peak demand rather than its usage, so an average per kWh would mislead. For the example site above, delivery works out between 3.82 and 5.46 cents per kWh across the four utilities. Your own bill's TDU lines divided by its kWh gives your figure.
Can a business avoid TDU delivery charges?
Not by switching supplier: every provider passes the same tariff charges through, and the rules cap what it bills at the tariff amount. Texas law also requires the utility to charge what its tariff prescribes for your rate class. What a business can change is the load the tariff measures: its monthly peak, whether a ratchet applies, its load factor band, its power factor, and whether it reaches 700 kW and moves to 4CP billing.
Why did my TDU delivery charge go up?
Usually for one of three reasons. Your peak demand rose, or a ratchet is holding your billed kW near last summer's peak. A rider changed: TCRF and DCRF move between rate cases, and in 2026 all four utilities revised them. Or the utility finished a rate case: Oncor's new rates took effect June 1, 2026 with an interim surcharge from August through December, and TNMP's on September 13, 2026.
What is TCRF on an electric bill?
The Transmission Cost Recovery Factor: the line that passes changes in the utility's wholesale transmission costs through to customers, under PUCT Rule 25.193. The rule has it updated on March 1 and September 1, though some 2026 revisions carry other dates. For business sites above the class threshold it is billed per kW of demand, and per 4CP kW at sites that have reached 700 kW.
Does a fixed-rate contract cover TDU changes?
Not for small businesses. Under PUCT Rule 25.475, a fixed-rate product for a site with a peak under 50 kW may still change to reflect actual changes in TDU charges, ERCOT administrative fees, or new laws. Above 50 kW that rule does not apply, so the contract's own pass-through terms decide.
What is SCRF on an electric bill?
SCRF is not a TDU charge. SCRF appears on electric cooperative bills (CoServ, Navasota Valley and others) and repays the bonds co-ops issued under Senate Bill 1580 to cover Winter Storm Uri costs from February 2021. The nearest TDU equivalent is a system restoration charge.

Sources and scope

Supplier explanations support the general contract and billing points in this guide. Your own agreement and service location determine the terms that apply to you.

Wire & Watt wrote this guide from the sources below. No supplier or utility paid for it or reviewed it. The supplier a business chooses pays us, never the business: how we’re paid.

Put it into practice

Have a contract to review?

Start with your business ZIP, business name and email. Add every page of your bill when you have it. With Box Energy, we compare available offers. No fee for our help.

Start my rate comparison

Before you choose

Make sense of your next contract.

Contract timing

Business electricity contract renewal: when it ends

What happens when a Texas business electricity contract ends: the 14-day notice and no-penalty rules for small accounts, and how early to lock the next term.

Read the guide
Quote comparison

How to compare commercial electricity quotes

Line up business electricity quotes on the same basis: same meter, usage, start date and term, what each rate includes, and what to check before you sign.

Read the guide
Bill basics

How to read a commercial electricity bill (Texas)

Usage, supply, delivery, demand and taxes: what each line on a business electric bill means, which one a new contract changes, and what to have ready.

Read the guide
Demand charges

Demand charges: what they are and how to lower them

Why a business pays for its busiest 15 minutes of the month, how demand differs from usage, what a ratchet and 4CP do, and how to lower the peak. Texas rules.

Read the guide
Delivery charges

Oncor TDU delivery charges for businesses (2026)

What each Oncor delivery charge pays for, why 2026 business bills changed (new rates June 1, a surcharge from August, riders October 4) and the 80% ratchet.

Read the guide
Calculator

Oncor demand ratchet calculator

Work out the demand Oncor bills a Texas business this month: the 80% ratchet, its 20 kW and 25% load factor exemptions, and your load factor band.

Read the guide
Delivery charges

CenterPoint TDU delivery charges for businesses (2026)

What each CenterPoint delivery charge on a Houston business bill pays for, why it's billed in kVA, the 2026 rider changes, and how it differs from Oncor.

Read the guide
Prices and charges

Texas commercial electricity prices and delivery charges

What Texas businesses pay for electricity on average (EIA, monthly) and the current Oncor and CenterPoint business delivery charges, dated to each tariff.

Read the guide
Rate types

Fixed vs variable business electricity rates in Texas

What each rate type lets a Texas supplier change, why sites under 50 kW can only buy fixed or variable, and what to ask about an indexed plan.

Read the guide
Load factor

Electricity load factor: how to calculate it, and what's good

Load factor compares a business's average electricity demand with its peak. Calculate it from three numbers on your bill, see what counts as good, and how to raise it. Calculator.

Read the guide
Bill basics

ESI ID: what it is and how a Texas business finds it

The ESI ID identifies each electricity service point in Texas: what it looks like (17 or 22 digits), where it is on the bill, and how to look it up.

Read the guide
Demand

ERCOT 4CP: 2025 peak dates, the formula and who pays

A site's average demand at ERCOT's four summer peaks: the 2025 peak dates, the formula worked through, who pays at Oncor and CenterPoint, and how to lower it.

Read the guide
Demand

Power factor charges in Texas: the 95% rule

Power factor is kW divided by kVA. Below 95%, Oncor, AEP Texas and TNMP can raise billed demand, and CenterPoint bills in kVA. The rule, an example, the fix.

Read the guide
Data

Oncor vs CenterPoint vs AEP vs TNMP delivery charges

What the same business pays each month for delivery from Oncor, CenterPoint, AEP Texas and TNMP, at three site sizes, from current tariffs. Download the CSV.

Read the guide
Basics

Commercial electricity: what it is, how it's billed and what businesses pay

What makes electricity "commercial", how a business bill differs from a home one, whether it costs less per kWh, and what a restaurant, hotel or store pays a month, from EIA data for August 2026.

Read the guide
Data

Commercial electricity prices by state, per kWh (August 2026)

What businesses pay for electricity in every state and DC: EIA's commercial average per kWh for August 2026, the change in a year and since 2020, and industrial and residential for comparison. Download the CSV.

Read the guide
Restaurant electricity

Put your restaurant’s rate beside the options.

Start with your business ZIP. Add your bill now or later. We compare available supply offers with Box Energy.

Start my comparison